{"id":1621,"date":"2008-11-08T12:35:00","date_gmt":"2008-11-08T12:35:00","guid":{"rendered":"https:\/\/mapir.isa.uma.es\/mapirwebsite_wordpress\/?p=1621"},"modified":"2021-11-30T12:23:49","modified_gmt":"2021-11-30T12:23:49","slug":"tcs-tunnel-continuous-setout","status":"publish","type":"post","link":"https:\/\/mapir.isa.uma.es\/mapirwebsite\/?p=1621","title":{"rendered":"TCS: Tunnel Continuous Setout"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img src=\"http:\/\/mapir.isa.uma.es\/mapirwebsite\/images\/imagenes\/Generales\/spanish-flag.png\" alt=\"in spanish\"\/><\/figure>\n\n\n\n<p>Una de las operaciones que habitualmente deben realizar los t\u00e9cnicos durante la perforaci\u00f3n de un t\u00fanel, y en general en cualquier obra, es el&nbsp;<strong><em>replanteo<\/em><\/strong>. Replantear tiene&nbsp;por objeto trasladar fielmente al terreno las dimensiones y formas indicadas en la documentaci\u00f3n t\u00e9cnica de la obra. Para el caso particular de la construcci\u00f3n de t\u00faneles, mediante el replanteo se materializan y se\u00f1alizan los puntos de apoyo, puntos de referencia y de control de la obra tanto en la b\u00f3veda como en los hastiales o en la rasante de la excavaci\u00f3n.&nbsp;Para ello se suelen utilizar clavos met\u00e1licos o marcas de pintura, que sirven como referencias planim\u00e9tricas y\/o altim\u00e9tricas.<\/p>\n\n\n\n<!--more-->\n\n\n\n<p>El&nbsp;<strong>objetivo&nbsp;<\/strong>de este proyecto es desarrollar un prototipo, que denominamos TCS (<em>Tunnel Continuous<\/em>&nbsp;<em>Setout<\/em>), que realice de&nbsp;<em>manera autom\u00e1tica la tarea de replanteo y marcado de los puntos de control<\/em>. El sistema debe medir de manera precisa el frente de trabajo del t\u00fanel, realizar los c\u00e1lculos topogr\u00e1ficos necesarios teniendo en cuenta las especificaciones del proyecto, y plasmar sobre la pared de forma continua, mediante la proyecci\u00f3n de luz l\u00e1ser, el perfil calculado. La automatizaci\u00f3n de este proceso proporciona a los operarios de la excavaci\u00f3n informaci\u00f3n precisa y continua en el tiempo, a partir de la cual realizar el guiado de la perforaci\u00f3n, facilitando el trabajo sin interrupciones.<\/p>\n\n\n\n<p>Se prev\u00e9 que el sistema TCS sea capaz de trabajar a distancias de hasta 30 metros, pudiendo montarse bien sobre un tr\u00edpode en el suelo o bien en el techo o pared del t\u00fanel, para menor entorpecimiento de las labores de excavaci\u00f3n\/perforaci\u00f3n.<\/p>\n\n\n\n<p>El sistema a desarrollar en este proyecto es totalmente innovador en el campo de la ingenier\u00eda civil, no solo en Espa\u00f1a, sino a nivel mundial. Los beneficios derivados redundan en:<\/p>\n\n\n\n<ul><li>Una&nbsp;<strong>disminuci\u00f3n del tiempo<\/strong>&nbsp;de ejecuci\u00f3n de la obra, ya que se eliminan las paradas para replantear, lo que a menudo exige que se retire la maquinaria para poder realizar el marcado de puntos en la pared.<\/li><li>Se&nbsp;<strong>reducen costes<\/strong>, ya que el replanteo se realiza de una manera m\u00e1s automatizada, requiriendo la intervenci\u00f3n de t\u00e9cnicos top\u00f3grafos s\u00f3lo cuando se ha de mover el sistema de replanteo TCS(aproximadamente cada 25 metros).<\/li><li><strong>Mayor seguridad<\/strong>, puesto que no es necesario que operarios se sit\u00faenen el frente de excavaci\u00f3n pararealizar el marcado.<\/li><\/ul>\n\n\n\n<blockquote class=\"wp-block-quote\"><p><strong>REFERENCE:<\/strong>&nbsp;OTRI-8.06\/5.56.3153<br><strong>TITLE:<\/strong>&nbsp;TCS: SISTEMA DE REPLANTEO Y MARCADO CONTINUO DE T\u00daNELES<br><strong>PRINCIPAL RESEARCHER:<\/strong><a href=\"https:\/\/mapir.isa.uma.es\/mapirwebsite\/?p=1536\" data-type=\"URL\" data-id=\"https:\/\/mapir.isa.uma.es\/mapirwebsite\/?p=1536\" target=\"_blank\" rel=\"noreferrer noopener\">JAVIER GONZ\u00c1LEZ-JIM\u00c9NEZ<\/a><br><strong>INSTITUTION:<\/strong>&nbsp;UNIVERSITY OF M\u00c1LAGA<strong><br>FUNDER:<\/strong>&nbsp;SACYR S.A.U.<strong><br>DEPARTMENT:<\/strong>&nbsp;SYSTEM ENGINEERING AND AUTOMATION<\/p><\/blockquote>\n\n\n\n<p><strong>Publications<\/strong><\/p>\n\n\n\n<p>Publications in the scope of this project:<\/p>\n\n\n\n<iframe loading=\"lazy\" style=\"line-height: 1.3em;\" src=\"https:\/\/mapir.uma.es\/mapirpubsite\/index.php\/export\/bytopic\/44\/1\/aigaion_pubs_for_joomlawrapper.css\/none\/mapir_formatted_list\/type\/none\" width=\"100%\" height=\"500\" frameborder=\"0\"><p>The list is loaded from another server. If you see this, there has been a problem.<\/p><\/iframe>\n","protected":false},"excerpt":{"rendered":"<p>Una de las operaciones que habitualmente deben realizar los t\u00e9cnicos durante la perforaci\u00f3n de un t\u00fanel, y en general en cualquier obra, es el&nbsp;replanteo. Replantear tiene&nbsp;por objeto trasladar fielmente al terreno las dimensiones y formas indicadas en la documentaci\u00f3n t\u00e9cnica de la obra. Para el caso particular de la construcci\u00f3n de t\u00faneles, mediante el replanteo&#8230;<\/p>\n","protected":false},"author":8,"featured_media":1673,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false},"categories":[5],"tags":[],"_links":{"self":[{"href":"https:\/\/mapir.isa.uma.es\/mapirwebsite\/index.php?rest_route=\/wp\/v2\/posts\/1621"}],"collection":[{"href":"https:\/\/mapir.isa.uma.es\/mapirwebsite\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mapir.isa.uma.es\/mapirwebsite\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mapir.isa.uma.es\/mapirwebsite\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/mapir.isa.uma.es\/mapirwebsite\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1621"}],"version-history":[{"count":4,"href":"https:\/\/mapir.isa.uma.es\/mapirwebsite\/index.php?rest_route=\/wp\/v2\/posts\/1621\/revisions"}],"predecessor-version":[{"id":1674,"href":"https:\/\/mapir.isa.uma.es\/mapirwebsite\/index.php?rest_route=\/wp\/v2\/posts\/1621\/revisions\/1674"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mapir.isa.uma.es\/mapirwebsite\/index.php?rest_route=\/wp\/v2\/media\/1673"}],"wp:attachment":[{"href":"https:\/\/mapir.isa.uma.es\/mapirwebsite\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1621"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mapir.isa.uma.es\/mapirwebsite\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1621"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mapir.isa.uma.es\/mapirwebsite\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1621"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}